Start a package
Structural steel detailing for fabricators · AI-first · est. 2024

Steel detailing
that checks itself.

Shop and erection drawings for steel fabricators. Software reads every dimension back against the SDS/2 model. A detailer signs it. You watch it happen, live.

A beam shop drawing being checked against the model: dimensions marked green, amber and red ABC 22H89 · W16x31 24'-6"12'-0 1/2"12'-5 1/2" 2'-8"1'-4" GRADE A992 · 3/4" A325-N · BEARING
Sheet
22H89
Checked by
Dimension Check
Status
1 to look at
> reading sheet 22H89 … 41 dimensions found > 39 agree with the model > 1 to confirm: 2'-8" end gauge reads 2'-7 15/16" > 1 to look at: 12'-5 1/2" does not match grid B–C. Sent to the detailer.
258,808
dimensions and marks read on one project, in 20 minutes
1,673MEMBERS
placed in the model from drawings in 205 seconds
5,500SHEETS
under drawing control, every revision tracked
152RFIs
raised, answered and closed with a time stamp on each

Six steps.
Same order, every job.

Red steps are done by software. Green steps are done by a person who has detailed steel for years. The sheet is never issued unchecked.

1

Brief

Drawings, specs and your standards in one place.

Machine collects
2

Model

Framing read from the drawings, placed in SDS/2.

Machine places
3

Connect

Connections to your shop practice.

Person judges
4

Check

Every dimension read back against the model.

Machine checks
5

Judge

A checker looks only at amber and red.

Person judges
6

Issue

Under drawing control. Your approver signs.

Machine records
How we work, in full →

Not a detailer
with a chatbot

AI-first means the software does the reading, the counting and the filing. It never means a model signs a sheet. Four rules we keep.

  • 01Nothing is issued unchecked.Every dimension on every sheet is read back against the model before a person signs it.
  • 02A person signs every sheet.Software raises doubts. A checker with years on steel decides. Their name is on it.
  • 03You see what we see.Progress, RFIs and approvals are live. You never wait for a Friday report.
  • 04Your standards, not ours.Shop practice, connection preferences and sheet layout are set per fabricator and kept.

Steel we have
detailed

The Ferric Group is new. The detailers are not. Through OM Steel Solutions they have detailed structural steel for American fabricators since 1999, in every sector that builds with it. The numbers are counted from our own project records and SDS/2 models.

316
structural steel projects on record, 1998 to 2024
540,000+
steel pieces modelled in SDS/2 since 2012
208,000 T
tons of structural and miscellaneous steel since 2012
27
years of detailing, since 1999
65%
of the team had been with us over ten years, at the 2020 count
2024 TO 2026 · ON OUR SDS/2 SERVERS60+ jobs, the biggest namedabout 135,000 members modelled30,000+ detail drawings39,800 members on the largest, a rocket assembly complex of three buildings
Samsung semiconductor plant, Taylor TXBlue Origin · three baysSDI aluminium mill, Columbus MS · 17,700 t181 Mercer Street, NYU · 12,100 tCerro Verde copper, Peru · 8,800 tNovelis, Guthrie KY · 8,200 tRazorback Stadium · 72,000 seatsLaGuardia Central HallMemorial Sloan KetteringUPS Fulton County hubBMW Spartanburg press shopHyundai MontgomeryHonda AlabamaNestlé Purina, King William VASteel Dynamics, Sinton TXThyssenKrupp CalvertDuke Energy GoldsboroEnterprise Mont BelvieuValero Port ArthurDataBank ATL5 data centreAmazon IrondaleNASA MarshallNorthrop Grumman MelbourneLambeau FieldWashington DC Convention CenterMiami International AirportNew York Times BuildingCalgon Carbon Line G

Stadiums · airports · towers · hospitalsPublic buildings

181 Mercer Street for NYU (12,100 t), Razorback Stadium north end zone (72,000 seats, 3,400 t), LaGuardia Central Hall and its passenger bridge (4,300 t), Memorial Sloan Kettering (3,800 t), Northside Hospital Atlanta, St. Jude Children's Research Hospital (2024), Lambeau Field, Washington DC Convention Center, Miami International, the New York Times Building.

Power · gas · mining · chemicalsEnergy and process

Cerro Verde copper concentrator, Peru (8,800 t), Enterprise Mont Belvieu PDH unit (3,200 t), Duke Energy Goldsboro and Cape Fear, Dominion Chesterfield, Elba LNG, Valero Port Arthur pipe racks, Calgon Carbon Line G (1,900 t), Solvay soda ash, Safford copper leach, Pueblo Viejo mine.

Semiconductor · automotive · steel · aluminiumFactories and mills

Samsung semiconductor plant, Taylor, Texas (8,400 t plus pipe racks), SDI aluminium mill, Columbus, Mississippi (17,700 t, plus 7,500 t of exit structure platforms), Steel Dynamics Sinton, HYBAR rebar mill (2024), Novelis Guthrie (8,200 t), ThyssenKrupp Calvert, BMW Spartanburg (press shop, Halls 32 and 50), Hyundai Montgomery (3,500 t), Honda Alabama, GM Wentzville, Nestlé Purina (2,200 t).

Aerospace · data centres · logistics · officesEverything else

Blue Origin high, mid and low bays (39,800 members, 2025 to 2026), NASA Marshall building 4220, Northrop Grumman Melbourne (500,000 sq ft), Aerojet Rocketdyne, DataBank ATL5 data centre (2024), UPS Fulton County (3,600 t) and Nashville hubs, UPS Vanderlande Mebane, Amazon Irondale, Redstone Gateway, Murphy Oil headquarters, Fort Wayne airport hangar.

All 316 projects, by year and sector →
A company of OM Steel Solutions

The same detailers.
A shorter line to you.

OM Steel Solutions Private Limited is the parent company. The Ferric Group was set up in 2024 to sit closer to the fabricators it serves: real-time updates, answers the same day, and detailing that uses AI from the first sheet.

Software SDS/2 · Knowledge Keeper (our own)
Where India · US Midwest (Kansas City)
Hours Your morning is our evening. Questions answered the same day.
OM Steel Solutions Private Limited

Straight
answers

The questions fabricators ask before the first package.

What does AI-first steel detailing mean?

Software does the reading, counting, checking and filing on every job. It reads every dimension on every shop drawing back against the SDS/2 model and flags what does not agree. A detailer with years on steel judges the flags and signs every sheet. No sheet is issued unchecked, and no sheet is signed by software.

Which software do you detail in?

SDS/2 for modelling and drawings. Knowledge Keeper, our own platform, for dimension checking, drawing control, RFIs, approvals and live progress.

Where are you based?

Detailing teams in India and a presence in the US Midwest, Kansas City. Established 2024, a company of OM Steel Solutions Private Limited.

How do I start?

Send one package: contract drawings and specs, your shop standards, the sequence or phase, and the date you need it. You get it back checked, with the check visible, and a live screen showing every step.

Send us one package.

One set of drawings, one phase, one sequence. You get it back checked, with the check visible, and a live screen showing every step.

Start a package
what to send
— contract drawings and specs
— your shop standards
— the sequence or phase
— the date you need it